
Referencje
Historia globalnego sukcesu
Referencje
Historia globalnego sukcesu
Data dostawy Sortuj malejąco | Klient | Obiekt / Moc | Kraj | Paliwo | Przemysł | Dostarczone urządzenia | Obszary dostaw | Artykuły | |
---|---|---|---|---|---|---|---|---|---|
1997 | Kapuni Energy NZ | Kapuni Energy Supply Facility | New Zealand | Gas | Petrochem | 2 x 45 t/hr HRSG | Energy Recovery | ||
1999 | ABB Alstom | BP Refinery - Bulwer Island | Australia | Gas | Petrochem | 2 X 46 t/hr HRSG | Energy Recovery | ||
2001 | RWE Power | Niederaußem BOA, Unit K | Germany | Lignite | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency | ||
2007 | Enel Produzione SpA | Torrevaldaliga North, 3 Units | Italy | Hard Coal | Power Industry | 204 x Sootblower (108 x wall deslaggers V92 / 6x thermo probes TS-L / 84 x long retractable sootblowers RK-SL / 12 x helical sootblowers PS-SB / 12 x axial sootblowers PS-AL) | Boiler Efficiency | ||
2009 | Unión Fenosa (now: Gas Natural) | La Robla Unit 2 | Spain | Bituminous Coal | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency | ||
2010 | Alstom Power System GmbH | Belchatow, 10 Units | Poland | Lignite | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency | ||
2010 | Soma Ab Elektrik Uretim (SEAS) | Soma power plant, 4 Units | Turkey GB | Lignite | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency |
|
|
2010 | Enel OGK-4 | Berezovskaya GRES 1 Unit 1 & 2 & 3 | Russia | Lignite | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency |
|
|
2011 | STEAG AG | Luenen, 800 MW | Germany | Coal | Power Industry | Dry bottom ash hanlding system DRYCON | Material Handling | ||
2011 | Chevron Australia & DSME Co Ltd | Wheatstone Offshore Platform | Australia | Gas | Petrochem | 3 x 105 TPH Waste Heat Recovery Unit | Energy Recovery | ||
2011 | Doosan Heavy Industrys and Construction | Rabigh VI Kingdom Unit 1-4 | Kingdom of Saudi Arabia | Oil | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency | ||
2012 | IHI Power System Germany | Luenen, 1 x 750 MW | Germany | Bituminous Coal | Power Industry | 2 x Conveying systems / Dry bottom ash handling system DRYCON | Material Handling | ||
2012 | Vattenfall Europe AG | Lippendorf Unit R & S | Germany | Lignite | Power Industry | SMART Clean System | Boiler Efficiency | ||
2013 | Burmeister & Wain Energy A/S | Eco2 Lincs Ltd., 40 MW | Denmark | Biomass | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency | ||
2013 | Modec International | T.E.N FPSO | Ghana | Gas | Petrochem | 3 x 230.7 TPH Waste Heat Recovery Units | Energy Recovery | ||
2013 | CACI La Carlotta | CACI La Carlotta | Philippines | Baggase | Biomasse | New Steel 'H'® Economiser | Energy Recovery | ||
2013 | Wellman & Co | Eastern Sugar | Thailand | Baggase | Biomasse | Replacement Steel 'H'® Economiser | Energy Recovery | ||
2013 | Doosan Heavy Industrys and Construction | Yonghung Unit 5 & 6 | Korea | Bituminous Coal | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency | ||
2013 | Delta Electricity | 660 MW Vales Point Power Station | Australia | Bituminous Coal | Power Utility | Replacement Steel 'H'® Economiser | Energy Recovery | ||
2013 | Leroux & Lotz | Senegal Oil RK-SL 2 | Senegal | Oil | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency | ||
2013 | SK Engineering & Construction (SKEC) | Minera Panama S.A. PACO , 2 x 160 MW | Panama | Bituminous Coal | Power Industry | 2 x Dry Bottom Ash Handling systems DRYCON | Material Handling |
|
|
2014 | Babcock Hitachi KK | 1000 MW - Tachibanawan Power Station | Japan | Bituminous Coal | Power Utility | New Steel 'H'® Economiser | Energy Recovery | ||
2014 | Tully Sugar Limited | Tully Sugar Limited | Australia | Baggase | Biomasse | Replacement Steel 'H'® Economiser | Energy Recovery | ||
2014 | IHI Japan | 700 MW Tanjung Bin | Malaysia | Bituminous Coal | Power Utility | New Steel 'H'® Economiser | Energy Recovery | ||
2014 | Synergy | Muja Power Station | Australia | Bituminous Coal | Power Utility | New Steel 'H'® Economiser | Energy Recovery | ||
2014 | Hitachi Power Europe | Medupi & Kusile, 12 Units | South Africa | Bituminous Coal | Power Industry | On-load boiler cleaning equipment | Boiler Efficiency | ||
2014 | IHI | Tanjung Bin-Jimah #1 & #2 Power Station - Japan | Japan | Bituminous Coal | Power Utility | New Steel 'H'® Economiser | Energy Recovery | ||
2014 | IHI | 700 MW - Nanao-Ota #2 Power Station | Japan | Bituminous Coal | Power Utility | New Steel 'H'® Economiser | Energy Recovery | ||
2015 | SCHOELLERSHAMMER | Schollershammer Paper Mill | Germany | Braunkohle | Pulp & Paper | Dry Bottom Ash Handling system DRYCON Compact | Material Handling | ||
2015 | Lyttleton Engineering | Pioneer Generation, Dunedin | New Zealand | Coal | Power Industry | New Steel 'H'® Economiser | Energy Recovery | ||
2015 | Modec International | Cidade De Campos Dos Goytacazes MV29 FPSO | Brasil | Gas | Petrochem | 4 x 344.2 TPH Waste Heat Recovery Units | Energy Recovery | ||
2015 | Stanwell Corporation | 480 MW - Tarong North Power Station | Australia | Bituminous Coal | Power Utility | New Steel 'H'® Economiser | Energy Recovery | ||
2015 | GE OIL & GAS | Pioneira de Libra FPSO | Brasil | Gas | Petrochem | 3 x 178 TPH Waste Heat Recovery Units | Energy Recovery | ||
2015 | EDMS Australia | South Johnston Sugar Mill | Australia | Baggase | Biomasse | Replacement Steel 'H'® Economiser | Energy Recovery | ||
2016 | Howden | Cemig | Brazil | n/a | Power Industry | On line sootblower system for APH | Boiler Efficiency | ||
2016 | BW Offshore | FPSO | Brazil | n/a | Marine | 1 x Waste Heat Recovery Unit | Energy Recovery | ||
2017 | Sumitomo Heavy Industries | Taketoyo 5, 1,070 MW | Japan | Bituminous Coal | Power Industry | Dry bottom ash hanlding system DRYCON | Material Handling |
|
|
2017 | SBM Offshore | LIZA DESTINY - FPSO | Guyana | Gas | Petrochem | 2 x 688 TPH Waste Heat Recovery Units | Energy Recovery | ||
2017 | Thyssen Krupp CSA | Rio de Janeiro | Brazil | n/a | Industrial Plants | Waste Heater Recovery Boiler performance study to check the economizer and EVA | Energy Recovery | ||
2019 | Mitsubishi Hitachi Power Systems Europe (MHPSE) | Turów, 450 MW | Poland | Lignite | Power Industry | 12 x SMART Cannon / 36 x F149 Wandbläser / 6 x SMART RSG Rußbläser / 48 x PS-H Lanzenschraubbläser / 45 x PS-HB Schraubbläser / 10 PS-AR Traversenbläser | Boiler Efficiency |
|